
The first shipment of plant and equipment arrives in Fiji consisting of: loader, excavator, mobile saw mill, planing machine, containers containing equipment, tools and materials, mobile home containers fully equipped with kitchen and bathroom and air conditioning, 2 x 10 kW solar power plant with battery bank and inverter, water desalination plant, and a high-tech sewage water treatment plant.
The equipment is being shipped to the development sites and installed.

